Français | Русский

Number: .........      Year: .........

 

Bunker boat / Bunker station / Tank truck

Bunkering Vessel

Name:

Name:

Unique European Vessel identification number / Official number:

Unique European Vessel identification number / Official number:

Boatmaster:

Boatmaster:

Bunkering attendant:

Responsible person for the bunkering procedure (bunker watch):

 

Filler necks

Total

1

2

3

 

Position of filler neck (e.g. port side aft; bow thruster tank; ...)

 

 

 

 

Tank capacity of the tanks to be filled via the respective filler neck:

 

 

 

 

Tank content before beginning of the bunkering according to reading of tank level:

 

 

 

 

Free capacity of the tanks immediately after the filler neck:

 

 

 

 

Agreed takeover quantity:

 

 

 

 

 


General:

Ο The mooring between the bunkering vessel and the bunker boat / bunkering station is correct and has been checked.

Ο The lighting is sufficient to supervise the bunkering procedure.

Ο Communication between bunker attendant and bunker watch is ensured.

Ο The hose lines are not subject to tensile forces nor to torsion; the minimum bending radii are respected.

Bunkering procedure      Ο with       Ο without overfill protection (automatic stopping device)

In case of use of a fuelling hose with flange or quick coupling:

Ο  The connection of the fuelling hose with the filler neck has been checked and is in good working condition.

In case of use of a fuelling hose with nozzle:

Ο  The bunker watch is familiar with the operation of the nozzle and is capable to activate an emergency stop.

Ο  The nozzle reaches deep enough into the filler neck and has been secured in its position.

Date: ..............................

Place (River-km respectively berth number): ..............................................

Beginning of bunkering procedure (Time): ..........................................

Bunkering attendant:                                              Bunker watch:

 

........................................                                   ...................................

Signature                                                            Signature


End of bunkering procedure (Time): ..............................

 

  • No labels