Washington D.C. (United States of America), 19 - 20 March 2013

Informal Documents

  File Modified
PDF File GTR9-6-03e.pdf (OICA) FlexPLI Testing: Propelling Accuracy 11 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-04e.pdf (Chair) Guidelines for the development of drawings for a test tool to be added as an Addendum to UN Mutual Resolution No. 1 (M.R.1) - (ECE/TRANS/WP.29/1101) 11 Mar, 2013 by Thomas Kinsky
Microsoft Word 97 Document GTR9-6-04e.doc (Chair) Guidelines for the development of drawings for a test tool to be added as an Addendum to UN Mutual Resolution No. 1 (M.R.1) - (ECE/TRANS/WP.29/1101) 11 Mar, 2013 by Thomas Kinsky
Microsoft Excel Sheet GTR9-6-05e.xls (Chair) Schedule to prepare an Addendum for FlexPLI for the M.R.1 11 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-05e.pdf (Chair) Schedule to prepare an Addendum for FlexPLI for the M.R.1 11 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-06e.pdf (Humanetics) FlexPLI GTR User Manual Rev. E 2013 11 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-07e.pdf (BASt) Definition of FlexPLI Biofidelic Assessment Interval 11 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-09e.pdf (BASt) FlexPLI Drawings 11 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-10e.pdf (BASt) FlexPLI Pre & Post Test 11 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-11e.pdf (JASIC) Consideration of the Rebound Phase 13 Mar, 2013 by Thomas Kinsky
Microsoft Powerpoint 97 Slideshow GTR9-6-11e.ppt (JASIC) Consideration of the Rebound Phase 13 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-12e.pdf (JASIC) Validation of Flex-GTR model 13 Mar, 2013 by Thomas Kinsky
Microsoft Word Document GTR9-6-13e.docx (OICA) Proposal for a wording to consider tolerances of the normal ride height 13 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-13e.pdf (OICA) Proposal for a wording to consider tolerances of the normal ride height 13 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-16e.pdf (Alliance/JP Research) JPR Report Evaluating the Methodology and Assumptions Made in Doc. GTR9-5-14 and GTR9-5-19 14 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-17e.pdf (Alliance) Large Truck/SUV Challenges 15 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-18e.pdf (Ford) FlexPLI Round Robin Test Results 15 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-20e.pdf (OICA) Discussion on Impactor Thresholds 15 Mar, 2013 by Thomas Kinsky
Microsoft Powerpoint 97 Slideshow GTR9-6-20e.ppt (OICA) Discussion on Impactor Thresholds 15 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-21e.pdf (OICA) Flex-PLI Rebound Issue: Industry Proposal (Update) 15 Mar, 2013 by Thomas Kinsky
Microsoft Powerpoint Presentation GTR9-6-21e.pptx (OICA) Flex-PLI Rebound Issue: Industry Proposal (Update) 15 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-15-Rev1e.pdf (Alliance/JP Research) Summary JPR Report Evaluating the Methodology and Assumptions Made in Doc. GTR9-5-14 and GTR9-5-19 - Rev. 1 16 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-22e.pdf (JASIC) FlexPLI Drawing Review (Surface Level) 16 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-24e.pdf (Bertrandt) Durability Study SN-03 19 Mar, 2013 by Thomas Kinsky
Microsoft Powerpoint Presentation GTR9-6-24e.pptx (Bertrandt) Durability Study SN-03 19 Mar, 2013 by Thomas Kinsky
Microsoft Word 97 Document GTR9-6-01-Rev1e.doc (Chair/Secretary) Agenda for the 6th meeting of the Informal Group on Global Technical Regulation No. 9 – Phase 2 (IG GTR9-PH2) - Final 19 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-26e.pdf (JASIC) Development of Injury Probability Functions for the Flexible Pedestrian Legform Impactor 20 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-08-Rev1e.pdf (BASt) Derivation of FlexPLI thresholds - Rev. 1 20 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-19-Rev1e.pdf (Shape) FlexPLI Round Robin Test Results - Rev. 1 20 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-23-Rev1e.pdf (Cellbond) FlexPLI Drawings Review - Rev. 1 20 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-27e.pdf (JASIC) Comments on Alliance and JP Research Documents (GTR9-6-15 and GTR9-6-16) 20 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-25e.pdf (BASt) Comments on GTR9-6-15 (JP Research review of JASIC & BASt FlexPLI Injury Reduction Estimate) 20 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-14-Rev1e.pdf (NHTSA-VRTC) FlexPLI Round Robin Testing - Rev. 1 31 Mar, 2013 by Thomas Kinsky
PDF File GTR9-6-28e.pdf (OICA) Certification test results of the OEM legform used in document GTR9-6-20 25 Apr, 2013 by Thomas Kinsky
Microsoft Word 97 Document GTR9-6-01e.doc (Chair/Secretary) Agenda for the 6th meeting of the Informal Group on Global Technical Regulation No. 9 – Phase 2 (IG GTR9-PH2) - Draft 29 May, 2013 by Thomas Kinsky
PDF File GTR9-6-08.pdf (BASt) Derivation of FlexPLI thresholds 29 May, 2013 by Thomas Kinsky
PDF File GTR9-6-14e.pdf (NHTSA-VRTC) FlexPLI Round Robin Testing 29 May, 2013 by Thomas Kinsky
PDF File GTR9-6-19e.pdf (Shape) FlexPLI Round Robin Test Results 29 May, 2013 by Thomas Kinsky
PDF File GTR9-6-23e.pdf (Cellbond) FlexPLI Drawings Review 29 May, 2013 by Thomas Kinsky
PDF File GTR9-6-15.pdf (Alliance/JP Research) Summary JPR Report Evaluating the Methodology and Assumptions Made in Doc. GTR9-5-14 and GTR9-5-19 29 May, 2013 by Thomas Kinsky
PDF File GTR9-6-02.pdf (Chair/Secretary) Minutes of the 6th meeting of the Informal Group on Global Technical Regulation No. 9 – Phase 2 (IG GTR9-PH2) - Draft 03 Jun, 2013 by Thomas Kinsky
Microsoft Word 97 Document GTR9-6-02.doc (Chair/Secretary) Minutes of the 6th meeting of the Informal Group on Global Technical Regulation No. 9 – Phase 2 (IG GTR9-PH2) - Draft 03 Jun, 2013 by Thomas Kinsky
PDF File GTR9-6-23-Rev2e.pdf (Cellbond) FlexPLI Drawings Review - Rev. 2 25 Jun, 2013 by Thomas Kinsky
Microsoft Word Document GTR9-6-02-Rev1e.docx (Chair/Secretary) Minutes of the 6th meeting of the Informal Group on Global Technical Regulation No. 9 – Phase 2 (IG GTR9-PH2) - 2nd Draft 03 Jul, 2013 by Thomas Kinsky
PDF File GTR9-6-02-Rev1e.pdf (Chair/Secretary) Minutes of the 6th meeting of the Informal Group on Global Technical Regulation No. 9 – Phase 2 (IG GTR9-PH2) - 2nd Draft 03 Jul, 2013 by Thomas Kinsky
Microsoft Word 97 Document GTR9-6-02-Rev2e.doc (Chair/Secretary) Minutes of the 6th meeting of the Informal Group on Global Technical Regulation No. 9 – Phase 2 (Final) 09 Sep, 2013 by Thomas Kinsky
PDF File GTR9-6-02-Rev2e.pdf (Chair/Secretary) Minutes of the 6th meeting of the Informal Group on Global Technical Regulation No. 9 – Phase 2 (Final) 09 Sep, 2013 by Thomas Kinsky

 

  • No labels